Customization: | Available |
---|---|
After-sales Service: | Oversea Installation & Training Services |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Soda Sparkling Carbonated Soft Drink Liquid Beverage Pet Bottle Filling Machine
NAVAN carbonated drink bottling machine combines washing,filling and rotary capping functions into one unit which is a fully automatic and high efficieney liquid packing equipment.
It is suitable for filling and packaging beverages containing carbon dioxide or other sparking drink.
This washing filling capping machine is mainly used for Carbon dioxide drink, such as cola, soda water and so on.The machine design is shorten the time for the drink material contact with outside, Increase the sanitation condition throughout economy benefit.
Washing Parts. -Rotary rinsing turret one treatment, fixed nozzles, with grippers. -The grippers take the bottles from the inlet star-wheel while they are still driven by the star-wheel, thus guaranteeing a safe grip. -After the gripping, the bottle is turned upside down and above a spraying nozzle which directs a stream of rinse water into the bottle. After the draining period the bottle is turned over to an upright position again. |
|
Filling Parts. -The star-wheels drive the bottles always "by the neck" through the rinsing, filling and capping steps. For the various types of bottle, it is easy to adjust the structure for the operator by our specialized design. -Product bowl is to reduce the loss of heat. -If the temperature is low than the setting value, the filling valves will stop and return the last beverage in filling valve to recycle tank and return to UHT again to sterilize with pump. |
|
Capping Parts. -Rotary capping turret, suitable to the application of screw plastic caps on PET bottles -The fixed part consists of the cap hopper, the cap feeder with relevant motor and the cam actuating the capping heads. -The heads are raised and lowered by the action of a follower that is riding on a shaped cam |
Model | CGFD8-8-4 | CGFD12-12-5/6 | CGFD18-18-6 | CGFD24-24-8 |
Production capacity | 800~1000 | 2000 | 4000 | 8000 |
(500ml) | ||||
Suitable bottle | Volume=100-2000ml Diameter φ=50-100 | Volume=100-2500ml Diameter φ=50-108 | ||
specification | Bottle height H=150 ~340mm | Bottle height H=150 ~350mm | ||
Bottle type | Plastic bottle / PET Bottle | |||
Bottle neck/Cap Style | Plastic Screw Cap | |||
Air source pressure(Mpa) | 0.5-0.6 | |||
Motor power(kw) | Main motor 1.9kw | Main motor 3.5kw | Main motor 4.0kw | Main motor 4.8kw |
Power Supply | Voltage:220V~415V,3phase; | |||
Frequency:50HZ/60HZ or your requirement | ||||
Overall dimensions | 1900*1420*2000 | 2050*1800*2400 | 2580*2100*2200 | 2780*2200*2200 |
(mm) | ||||
Weight (kg) | 1500 | 2500 | 3500 | 4500 |
All machines could be customized , we could design design and produce machines according to your request. |
Model | CGFD32-32-10 | CGFD40-40-10/12 | CGFD50-50-12/15 | CGFD60-60-15 | ||
Production capacity | 10000 | 12000~13000 | 15000~16000 | 22000-24000 | ||
(500ml) | ||||||
Suitable bottle | Volume=100-2000ml Diameter φ=50-108 Bottle height H=150 ~340mm | |||||
specification | ||||||
Bottle type | Plastic bottle / PET Bottle | |||||
Air source pressure (Mpa) | 0.5-0.6 | |||||
Features | Voltage:220V~415V,3phase; Frequency:50HZ/60HZ or your requirement | |||||
Power Supply | Main motor 7.6kw | Main motor 8.3kw | Main motor 9.6kw | Main motor 15Kw | ||
Overall dimensions | 3800*2800*2600 | 4600*2800*2600 | 5450*3300*2600 | 6500*4500*2600 | ||
(mm) | ||||||
Weight (kg) | 6500 | 8500 | 9800 | 12800 | ||
All machines could be customized , we could design design and produce machines according to your request. |
Bottle Design Label Design
·Navan machines are utilized in large and small companies all around the world since 1990s.
·Customized service,Navan machines can design the machines according your requirements.
·Navan machines provide complete full produciton line from A to Z.
About Us
Navan Industrial has invested its best resources in technical research, to design and realize innovative in bottle blowing, filling, capping , labeling and packing systems which enable to respond and reach different demands and achieve new goals everyday, seizing the market's expectations in the pass years .
At the same time , we also provides turn-key services for customers, from plant layout, equipment manufacturing, production line setup, to operators training. We are always trying our best to meet the demands of our customers continuously and seeking for mutual development.
Today Navan has enhanced its exsitence both in domestic and global market. Thanks to its various and perfect cases, we provide our customers with delicated and customized solutions at quick response. Navan machines are utilized in large and small companies all around the world since 1990s.
Massive experience gained through the years of water, juice , soft drink , beer, honeys, sauces etc., with all the abundant experience we are able to deal with any problems related to specific customers requirements, such as daily or special products., and perfect the creation of various machine to satisfy any customer's demands.
Q 1 When can I get installation from you? how much the cost?
When you finish the preparation conditions(water resource,electricity,air supply,production materials) according to our designed layout , please contact with our sales manager, we will dispatch engineer to you.
* Inspect and improve connection jobs together with your team .
* Guide your staff to operate machines , and explain how to operate and maintain machines .
* Collected your your comments on our machines , we will send feedback to our technical team to improve our machines continuously. The customer should be responsible for the room, meals and board and the two-way air tickets and visa and fee as well the allowance 100 USD per day for each person. And should be also responsible for the engineer's personal safety. Note: Normally when your preparation is done,you can contact with our sales people and cooperate us to get the visa for the engineer and our engineer will be there within 15 days more or less .
Q 2 How long time for installation?
According your machines order,we will send one or two engineers to your plant,it will take about 15 days to 30 days.
Q 3 When can I get my machine after I paid?
Normally production time is around 30-60days , it depends on your ordered machines and quantity . The shipping time is based on your destination port.(Usually we use Shanghai port , Ningbo Port as loading port )
Q 4 How about the spare parts?
We will send one year enough easy broken spare parts together with the machines together when delivery. During the warranty time, we will supply the spare parts with our cost price including and delivery fees.
Q 5 What`s your payment term?
We accept TT , TT/LC/Western union.etc